HYDROGRAPHIC SURVEY & MARINE STUDIES
|
Client
|
Date
|
Contract Title
|
|
Alexandria Harbor
|
2004
|
Positioning of 13 buoys at Alexandria and El Dekhila Harbor
|
|
International Naval Works
|
2005
|
Hydrographic survey of Rashid barrage
|
|
Hamza Associates
|
July
2005
|
Hydrographic survey at Ras Issa refinery at Yemen for the benefit of Hood Oil co.
|
|
Hamza Associates
|
2005
|
Hydrographic survey at Zoweiteya & Okela regions at Libya for the construction of 2 fishing harbors.
|
|
International marine Works co.
|
2005
|
Hydrographic survey of El-Baggor barrage at El Monofia
|
|
Bect
|
October
2005
|
Hydrographic survey at Port Said for the construction of a new resort
|
|
Egyco co.
|
January
2006
|
Hydrographic survey of Marina area for sand filling calculation.
|
|
Alexandria international of containers co.
|
March
2006
|
Hydrographic survey of Alexandria & El Dekhila Harbor.
|
|
Hamza Associates
|
March
2006
|
Hydrographic survey for the construction of Mukala Port-Daba , Republic of Yemen
|
|
International Naval Works
|
May
2006
|
Hydrographic survey at belkas regulator.
|
|
Timsah ship building offshore
|
July
2006
|
Hydrographic survey for dredging calculation at the Oriented Weavers Carpet co. at Sukhna.
|
|
International Naval Works
|
July
2006
|
Rig move operation for Sentafy company rig and ROV pilotage.
|
|
Client
|
Date
|
Contract Title
|
|
Hamza Associates
|
July
2006
|
Hydrographic survey at Tobrok (Libya) for the construction of new jetty
|
|
Archirodon
|
September
2006
|
Bathymetric survey for EL Dekhila Break water.
|
|
Geo Group
|
September
2006
|
Hydrographic survey at Port Said
|
|
Osoco
|
October
2006
|
Offshore Soil investigation & bathymetric survey at Ras Ghareb for the construction of a new jetty
|
|
Alexandria International of containers co.
|
November
2006
|
Hydrographic survey of Alexandria & El Dekhila Harbor.
|
|
Hamza associates
|
December
2006
|
Bathymetric survey at Damietta project area-discharge area & River Nile intake for the methanol project (Methanex)
|
|
International Naval Works
|
Jan
2007
|
Multi beam & side scan at jetty piles at LNG IDKO bathymetric survey.
|
|
Timsah ship building offshore
|
Jan
2007
|
Hydrographic survey for dredging calculation at the Oriental Weavers Carpet co. at Sukhna.
|
|
International Marine works
|
Jan
2007
|
Hydrographic survey at El Tawfiki regulator.
|
|
International Marine works
|
Jan
2007
|
Hydrographic survey at El-Menofi regulator
|
|
Hamza Associates
|
Feb
2007
|
Hydrographic survey a El-Marzoka-Libya for the construction of a new fishing harbor
|
|
Client |
Date |
Contract Title |
|
Petrojet |
April 2009 |
Hydrographic survey at |
|
Alexandria international container terminals (AICT) |
Alexandria international container terminals (AICT) |
Hydrographic survey at |
|
Alexandria international container terminals (AICT) |
June 2009 |
Hydrographic survey at Dekhila port container terminals |
|
Ebeido |
July 2009 |
Hydrographic survey at |
|
Egyco |
August 2009 |
Hydrographic survey at San Stefano – |
|
Gulf Inspection International |
September 2009 |
Hydrographic survey , Side scan Survey, wave and tide measurements and weather station installation at (KOC) |
|
Arab Contractors |
November 2009 |
Hydrographic & Topographic survey (by RTK DGPS) at Rashid for the construction of a new fishing harbor. |
|
INW |
January 2010 |
Bathymetric survey at Edfina, El Lahoon & Teirrah Barrage (River Nile) |
|
HOODOIL |
January |