Under water inspection

Client 

Date

Contract Title

Eco Group

September

2005

U/W inspection for the Quay walls of the Alexandria & Dekhela Port container terminals project period

Sidi Krir Generating Company

October

2005

Intake and Discharge Pipeline Positioning and Plotting during the annual outage

El Nasr Power Station

January

2006

Inspecting & videoing for installing and removing piles

Alexandria International container Terminal

December     2006

Videoing & Maintenance on jetty 71 at Alexandria Harbor.

Archirodon

April

2007

U/W cleaning, coating to 13 steel piles, installation anodes and installing PVC pipe in Dekhela Port.

Montaza Co. for Tourism & Investment

May

2007

U/W cleaning sea bed at El Montaza Beach.

Sidi Krir Generating Co.

August

2007

U/W Inspection pipe line Units 3 & 4.

Sidi Krir Generating Co.

October

 2007

Annual maintenance of unit 3 & 4 including inspection of pipeline & maintenance of buoys.

Montaza Co. for Tourism & Investment

From June

to September

2008

 U/W cleaning of  sea bed at El Montaza Beach

FUGRO

August

2008

Land Fall pipeline Positioning survey at Burulus

Sidi Krir Generating Co.

November

2008

U/W  internal inspection of intakes pipeline, Unit 3, 4

FUGRO

December

2008

AOC Near Shore Pipe Route positioning & Landfall Survey Ras Badran

FUGRO

December

2008

IPR Landfall Diver Survey / Magy Survey for Existing Pipelines / Camera Survey Ziet Bay 

SUMED

February

2009

UW inspection of the main pipelines at Nile River crossing area 

Sidi Krir Generating Co.

October

2009

Annual maintenance for unit 3 & 4

Sidi Krir Generating Co.

November

2009

Installation of new 6" chlorine pipeline for eastern intake unit 3 & 4

Port Said Power Plant

March

2010

Under water inspection and measurements